All4Certs Exam Archive [PDF and VCE] Free CertBus The Open Group OG0-091 VCE and PDF, Exam Materials Instant Download

[PDF and VCE] Free CertBus The Open Group OG0-091 VCE and PDF, Exam Materials Instant Download

Categories :

Attention please! Here is the shortcut to pass your OG0-091 exam! Get yourself well prepared for the The Open Group OG0-091 TOGAF 9 Part 1 exam is really a hard job. But don’t worry! We, CertBus, provides the most update exam PDF and VCEs. With CertBus latest exam questions and answerss, you’ll pass the OG0-091 TOGAF 9 Part 1 exam in an easy way.

We CertBus has our own expert team. They selected and published the latest OG0-091 preparation materials from The Open Group Official Exam-Center: http://www.certgod.com/OG0-091.html

QUESTION NO:68

A healthcare customer has an IBM System i server and an HP-UX server. They have high performance I/

O, image-based, and archival applications. The customer has asked the IBM team for guidance on IBM

DS8000 disk technologies. Which DS8000 disk technology would provide the best performance without

regard to cost to meet the customer requirement?

A. 73 GB 15k and 300 GB 15k drives

B. 73 GB SSD and 2TB 7.2k drives

C.

146 GB 15k and 300 GB 15k drives

D.

146 GB 15k and 2TB 7.2k drives

Correct Answer: B

QUESTION NO:33

A customer has a mission-critical application with redundant fabrics. The customer plans to replace older

EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller

(SVC). Which statement best describes the way to minimize the impact of data migration on the production

environment?

A. the production environment does not require an outage

B. the production environment requires an outage to install the SVC

C. the production environment requires an outage to install the DS8700

D. the production environment requires an outage to remove the EMC systems

Correct Answer: B

QUESTION NO:145

How does Worklight handle globalization of application messages?

A. It uses a user-provided JavaScript file.

B. It uses language-specific XML resources.

C.

It uses a system-provided globalization file.

D.

It uses a native language translation library.

Correct Answer: A

QUESTION NO: 1

An administrator is attempting to configure a new deployment of 56 POWER7 Blades across 4 IBM

BladeCenter H chassis. Each blade will be installed with an IVM and 2 LPARs.IVM is installed and the

administrator checks that both LHEA ports are reporting a Link State of “Up.” 2 LPARs are created and the

network traffic balanced by allocating one LHEA port to the first LPAR, the second port to the other. After

successfully installing the first LPAR via NIM, the administrator finds the second LPAR fails to netboot.

What should the administrator verify on the BladeCenter Chassis?

A. That 4 power supplies (PSU) have been installed.

B. That both the external LHEA ports have been cabled.

C. That a secondary I/O module has been installed and cabled.

D. That the Multi-Core Scaling (MCS) attribute is correctly set on both LHEA ports.

Correct Answer: C

QUESTION NO:62

The difference between an xsl:variable and xsl:param is that

A. Only one has a required name attribute, which specifies the name of the variable.

B. The value specified on the xsl:param variable is only a default value for the binding and can

be specified at