All4Certs Exam Archive [Latest Version] Easily Pass P2090-044 Exam With CertBus Updated IBM P2090-044 Preparation Materials

[Latest Version] Easily Pass P2090-044 Exam With CertBus Updated IBM P2090-044 Preparation Materials

Categories :

CertBus ensures to provide the most update P2090-044 IBM InfoSphere Information Server for Data Quality Fundamentals Technical Mastery Test v1 exam questions with the most accurate answers. CertBus P2090-044 are the most complete and authoritative exam preparation materials with which one can pass the P2090-044 exam in an easy way. Preparing for IBM P2090-044 IBM InfoSphere Information Server for Data Quality Fundamentals Technical Mastery Test v1 exam is really a tough task to accomplish. But CertBus will simplified the process.

We CertBus has our own expert team. They selected and published the latest P2090-044 preparation materials from IBM Official Exam-Center: http://www.certgod.com/P2090-044.html

QUESTION NO:40

An administrator has successfully completed installing the current cumulative PTF package, most recent Technology Refresh level, plus multiple group PTEs.

Due to time constraints a full system backup cannot be completed, but there is time for a subset of a full system save.

Which type of save will capture the changes made by the PTF and Technology Level installation?

A. Save System (SAVSYS)

B. Save System Data Only (SAVE menu option 22)

C. Save IBM product data – SAV OBJ((`/QIBM/ProdData’)(7QOpenSys/QIBM/ProdData’))

D. Save IBM Libraries, Save Configuration and Security Data – SAVLIB *IBM SAVCFG and SAVSECDTA

Correct Answer: B

QUESTION NO:159

A hybrid mobile application named App1 is failing to connect to the Worklight Server with the following

error code: “Application Error – The connection to the server was unsuccessful” Knowing that the

application should be available at “http://srv.ent.com:9099/wl” but without any access to the Worklight

Console, how can the support engineer ensure that the application App1 has been properly deployed?

A. Query the is-alive URL at “http://srv.ent.com:9099/wl/ws/rest/vitality?app=App1”

B. Query the preview URL at “http://srv.ent.com:9099/wl/apps/services/preview/App1/App1.html”

C. Invoke the Worklight Server Mobile Browser Simulator

at”http://srv.ent.com:9099/wl/_MobileBrowserSimulator/index.html?app=App1″

D. Use a remote debugging tool such as Weinre or iWebInspector to inspect the request to the

application’s init resource at”http://srv.ent.com:9099/wl/apps/services/api/App1/common/init”

ExamReal.com — 100% Real QandAs | 100% Real Pass

Correct Answer: A

QUESTION NO:157

An administrator needs to see the system assigned job number and percent of processing unit time attributed to all jobs currently running.

Which steps should the administrator take to accomplish this?

A. WRKJOB JOB(t), option 3 to display job run attributes

B. WRKACTJOB and press P11 two times to Display Thread Data

C. WRKSYSACT INFTYPF(*JOBS) and press PIO to update the list

D. WRKSYSSTS and press P19 to display Extended System Status

Correct Answer: B

QUESTION NO: 171

When using VMWare Full VM backup type with TSM Backup-Archive client which options need to

be selected?

A. VM machines to backup, VM host user id and password to use

B. domain full VM, VM options, VM host, VM folder, VM machines

C. VCB options, consolidated backup host name, user ID, password

D. no options need to be selected – once theVMWare Full is selected then VM does the rest

Answer: B

QUESTION NO:75

A customer has multiple applications on multiple open platforms in their current environment based on IBM

System Storage DS8100. They plan to set up a business continuity solution that meets the objective of

zero or little data loss for their business critical data. The customer has indicated that cost is a factor.

What should the storage specialist recommend?

A.

a DS8700 in the Business Continuity site with a Metro Mirror license

B.

a DS8700 with SAN Volume Controller in the Business Continuity site

C. a DS8700 in the Business Continuity site with Global Copy license

D. two new DS5300 servers (production and Business Continuity site) with a Global Copy license

Correct Answer: A