All4Certs Exam Archive Pass 1Y0-250 Exam By Practicing CertBus Latest Citrix 1Y0-250 VCE and PDF Braindumps

Pass 1Y0-250 Exam By Practicing CertBus Latest Citrix 1Y0-250 VCE and PDF Braindumps

Categories :

Which certification is the most popular and worthy to get? No doubt the 1Y0-250 Implementing Citrix NetScaler 10 for App and Desktop Solutions exam is a worth challenging task but you should take among all the IT certifications . CertBus is providing the latest version of 1Y0-250 PDF and VCE dumps now. Comprehensive understanding on 1Y0-250 Implementing Citrix NetScaler 10 for App and Desktop Solutions exam syllabus through CertBus 100% pass guarantee of the success on your 1Y0-250 Implementing Citrix NetScaler 10 for App and Desktop Solutions exam taking.

We CertBus has our own expert team. They selected and published the latest 1Y0-250 preparation materials from Citrix Official Exam-Center: http://www.certgod.com/1Y0-250.html

QUESTION NO:6

A BPM application developer has built an integration service that executes SQL calls. Within this

service, the BPM application developer makes use of the “SQL Execute Statement” service found

within the TWSYS toolkit. Review the snapshot of the data mapping for this service. The BPM

application developer wants to manage the “dataSourceName” value at runtime, instead of

hardcoding the value “jdbc/BPMTEST”.

Which features of IBM Business Process Manager V8.0 will allow the BPM application developer

to do this? (Choose two)

A. environment variables

B. auto tracked variables

C. localization resources

D. shared process variables

E. exposed process variables

Answer: A,E

QUESTION NO:162

A Worklight application does not need to connect to a server on startup. However, when previewing the

application on the device emulator, it is throwing a server connection error on start up. What is the

consequence if the connection error is resolved using the WL.Client.init({connectOnStartup:false}) API to

disable the connection to the server on application startup?

A. The application will not be able to subsequently connect to the server.

B. Server features other than the Remote Disable or Direct Update will be disabled.

C.

Any server features the application uses will only be available when it connects to the server.

D.

There will be no potential consequences as the runtime will safely disable server connectivity errors.

Correct Answer: C

QUESTION NO: 17

Which statement describes economies of scale as it relates to IBM

QUESTION NO:133

A change to POWER7 server firmware is being planned on an HMC managed system. The current server firmware level is AL720_108_066, and the new server firmware level will be AL730_078_035.

What must the administrator take into consideration for this task?

A. A backup of critical FSP data needs to be scheduled.

B. Downtime needs to be scheduled as this will be a disruptive update.

C. The system ESP should have both network ports configured to the HMC to guard against HMC connection loss.

D. Ensure the “Apply Immediate” option is selected on the Submit Task panel so the update will be concurrent.

Correct Answer: B

QUESTION NO: 55

The following exhibit shows a SAML version 1.1 assertion that is generated in the post-processing

step of an access control policy.

<saml:Assertion xmlns:saml=