[PDF and VCE] Free CertBus Microsoft 70-646BIG5 PDF Real Exam Questions and Answers Free Download
Do not worry about your 70-646BIG5 exam preparation? Hand over your problems to CertBus in change of the 70-646BIG5 Pro:Windows Server 2008, Server Administrator certifications! CertBus provides the latest Microsoft 70-646BIG5 exam preparation materials with PDF and VCEs. We CertBus guarantees you passing 70-646BIG5 exam for sure.
We CertBus has our own expert team. They selected and published the latest 70-646BIG5 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-646BIG5.html
QUESTION NO: 128
The IBM Tivoli Storage Manager V6.2 (TSM) server was started from Root user. These errors
appear and the server is not able to start:
ANR0172I rdbdb.c(1009): Error encountered performing action
InstanceStop. ANR0162W Supplemental database diagnostic
information: -1032:**No State Information Available (93)**:-1032
(**No Other Information Available (111)**).
Which command provides more information from the system?
A. db2 SQL1032
B. help ANR0162W
C. db2 ? SQL-1032
D. query ANR0162W
Answer: C
QUESTION NO:168
A developer is debugging a Worklight Adapter procedure that has been configured with the following
securityTest property in the adapter configuration file:
When the adapter procedure getSecureFeed is invoked by the client, the developer has noted that the
Worklight Server responds with HTML content rather than the expected JSON content from
getSecuredFeed function.
Which assertion is correct?
A. The Worklight Server is returning a dynamically generated HTML form indicating that the request is
authenticated.
B. The Adapter procedure is protected by either Form-based authenticator or Java-based (using custom
Login Module).
C. The Adapter procedure is protected by Adapter-based authenticator and the Worklight Server has
rejected the authentication.
D. The Adapter procedure is protected by Form-based authenticator and the Worklight Server is
responding to an unauthenticated request.
Correct Answer: D
QUESTION NO:63
A solution implementer is debugging a web service proxy which communicates with a backend service
http://server1:9092/myserv. The irregular performance to the backend service cannot be explained so a
packet capture is run to dig deeper into the issue. The results need to be stored in a file called packet-
capture. Also, the solution implementer wants to capture data only related to the specific backend service
host and across all interfaces. What CLI syntax should the solution implementer use and how can the
packet capture be analyzed?
A. packet-capture temporary:///packet-capture -1 10000 9000
and analyze using any text editor or word processor
B. packet-capture temporary:///packet-capture -1 10000 9000 “host server1”
and analyze using any ‘pcap’ compliant application, such as ‘tcpdump’ or ‘Wireshark’.
C. packet-capture-advanced all temporary:///packet-capture -1 10000 9000 “host server1” and analyze
using any ‘pcap’ compliant application, such as ‘tcpdump’ or ‘Wireshark’.
D. packet-capture-advanced all temporary:///packet-capture -1 10000 9000 “host server1” and analyze the
packet capture using the Troubleshooting section in the DataPower WebGUI.
Correct Answer: C
QUESTION NO:131
Given the following code:
What will the alert(WL.Client.getUserPref(‘key1’)); show?
A. The alert will not show since WL.Client.setUserPref cannot be called in the for loop since it is an
asynchronous function.
B. updatedValue1 since WL.Client.setUserPref({‘key1’ : ‘updatedValue1’}); will replace the value of key1
set in the for loop.
C. value1, updatedValue1 or null since WL.Client.setUserPref is an asynchronous function and there is no
guarantee which call, if any,will return first.
D. value1 since WL.Client.setUserPref(‘key1’, ‘updatedValue1’); will fail because WL.Client.deleteUserPref
(‘key1’) was notcalled before setting the new value.
Correct Answer: C
QUESTION NO:138
An IBM Worklight hybrid application supports Android 2.3 phones and tablets. It needs to be extended to
support Android 4 phones and tablets. After installing the Android 4 SDK, how can the IBM Worklight
Studio be used to accomplish this?
ExamReal.com — 100% Real QandAs | 100% Real Pass
A. Add a new application, environment, and create skins for Android 4 phones and tablets.
B. Add a new environment to existing application for Android 4, and create skins for Android 4 phones and
tablets.
C.
Add new skins for Android 4 phones and tablets to the existing Android environment, and
programmatically determine which skin to use atruntime.
D.
Add new skins for Android 4 phones and tablets to the existing Android environment, and let
the runtime determine which skin to useautomatically.
Correct Answer: C