All4Certs Exam Archive,Microsoft Archive Free Download the Most Update CertBus Nortel 920-193 Brain Dumps

Free Download the Most Update CertBus Nortel 920-193 Brain Dumps

How to pass 920-193 exam easily with less time? CertBus provides the most valid 920-193 exam preparation material to boost your success rate in Nortel 920-193 Ncss-Business communications manager 50(bcm50)rls.1.0 exam. If you are one of the successful candidates with CertBus 920-193 PDF and VCEs, do not hesitate to share your reviews on our Nortel materials.

We CertBus has our own expert team. They selected and published the latest 920-193 preparation materials from Nortel Official Exam-Center: http://www.certgod.com/920-193.html

QUESTION NO:44

A customer has one IBM System Storage DS8300 in their main data center with one IBM DS6800 at their

Disaster Recovery (DR) site. They are using the Remote Mirror and Copy (RMC) feature between the

sites. They utilize Tivoli Storage Manager for backups. They would like to replace a Microsoft Windows

server at the main site with a server at the DR site with a minimal amount of downtime. Which method will

achieve their goals?

A. locate the Tivoli Storage Manager data set for the server at the DR site, do a full backup, recover the

data to the DS6800, and make the data availableto the server B. create RMC relationships for all of the

data on the server to the DS6800, shut down the server, and make the data available to the new server

B.

shut down the server,create RMC relationships for all of the data on the server to the DS6800, and

make the data available to the new server

C.

recover the TSM backups to the DS6800 at the remote site, and make the data available to the new

ExamReal.com — 100% Real QandAs | 100% Real Pass

server

Correct Answer: B

QUESTION NO:119

During a review of environmental requirements before ordering an IBM System z9 server and IBM System

Storage DS8700, the customer states that the available power is 220 volts AC. Which feature

should be included with the DS8700 order?

A. Low Voltage

B. High Voltage

C. Remote System z Power Control

D. Battery Assembly

Correct Answer: A

QUESTION NO: 142

While trying to reject recent updates to the VIOS, an administrator received an error message stating that a

file set may not be rejected because a dependent file set is committed.

Which command can be used to overcome this error?

A. updateios -reject-f

B. updateios -remove

C. updateios -commit -u

D. updateios -cleanup

Correct Answer: B

QUESTION NO:157

An administrator needs to see the system assigned job number and percent of processing unit time attributed to all jobs currently running.

Which steps should the administrator take to accomplish this?

A. WRKJOB JOB(t), option 3 to display job run attributes

B. WRKACTJOB and press P11 two times to Display Thread Data

C. WRKSYSACT INFTYPF(*JOBS) and press PIO to update the list

D. WRKSYSSTS and press P19 to display Extended System Status

Correct Answer: B

QUESTION NO: : 114

An organization accepts certificates from two certificate authorities (CAs). Where should

the CA’s own certificates be located?

A. signer certificates in the file specified in the jct-cert-keyfile property

B. personal certificates in the file specified in the jct-cert-keyfile property

C. signer certificates in the file specified in the webseal-cert-keyfile property

D. personal certificates in the file specified in the webseal-cert-keyfile property

Answer: C

Explanation: