All4Certs Exam Archive Pass A2090-541 Exam By Practicing CertBus Latest IBM A2090-541 VCE and PDF Braindumps

Pass A2090-541 Exam By Practicing CertBus Latest IBM A2090-541 VCE and PDF Braindumps

Categories :

There is no need to worry when you are suffering the difficult time in the IBM Certified Advanced Database Administrator A2090-541 exam preparation, CertBus will assist you to pass the IBM Certified Advanced Database Administrator A2090-541 exam with latest update IBM Certified Advanced Database Administrator A2090-541 Assessment: DB2 9.7 DBA for LUW-Assessment PDF and VCE dumps. CertBus has the most comprehensive IBM exam preparation materials, covering each and every aspect of IBM Certified Advanced Database Administrator A2090-541 Assessment: DB2 9.7 DBA for LUW-Assessment exam curriculum. We ensure you 100% success in IBM Certified Advanced Database Administrator A2090-541 exam.

We CertBus has our own expert team. They selected and published the latest A2090-541 preparation materials from IBM Official Exam-Center: http://www.certgod.com/A2090-541.html

QUESTION NO:5

Which two plug-in types does the DB2 database system provide? (Choose two.)

A. Group retrieval

B. Kerberos authentication

C. Server authentication

D. Encryption authentication

Answer: A,C

Explanation:


QUESTION NO:14

Which set of procedures will be required to perform a rolling upgrade in a HADR

environment?

A. 1. Upgrade the system where the primary database resides.

2. Issue the TAKEOVER HADR command on the primary database server.

8

3. Upgrade the original primary database.

4. Return to the original configuration by switching the roles of the primary and standby

databases.

B. 1. Upgrade the system where the standby database resides.

2. Issue the TAKEOVER HADR command on the primary database server.

3. Upgrade the original primary database.

4. Return to the original configuration by switching the roles of the primary and standby

databases.

C. 1. Upgrade the system where the primary database resides.

2. Issue the TAKEOVER HADR command on the primary database server.

3. Upgrade the new primary database.

4. Return to the original configuration by switching the roles of the primary and standby

databases.

D. 1. Upgrade the system where the standby database resides.

2. Issue the TAKEOVER HADR command on the standby database server.

3. Upgrade the original primary database.

4. Return to the original configuration by switching the roles of the primary and standby

databases.

Answer: D

Explanation:


QUESTION NO:1

Given the DDL shown below:

CREATE TABLE tab1 (coll SMALLINT );

CREATE VIEW v1 AS SELECT coll FROMtabl WHERE coll > 25 ;

CREATE VIEW V2 AS SELECT COI1 FROM v1 WITH CASCADED CHECK

OPTION

CREATE VIEW v3 AS SELECT coll FROM v2 WHERE coll < 100 ;

Which statement will fail?

A. INSERT INTO v2 VALUES (35)

B. INSERT INTO v1 VALUES (5)

C. INSERT INTO v3 VALUES (25)

D. INSERT INTO v3 VALUES (200)

Answer: C

Explanation:


QUESTION NO:15

Which HADR feature minimizes the impact of software maintenance on the Standby

server?

A. Configure all AUTOMATIC features.

B. Configure all AUTOMATIC maintenance parameters.

C. Configure AUTOMATIC maintenance and perform a rolling upgrade

D. Configure AUTOMATIC maintenance and perform a roll forward.

Answer: C

Explanation:


QUESTION NO:21

A database administrator created a new database from an existing full database backup

image. If the original database resided on a 64-bit AIX server and the new database was

created on a different 64-bit AIX server, which two statements are correct? (Choose two.)

A. Existing SQL procedures must be dropped and re-created in the new database before

they can be used

B. Existing packages will be copied to the new database and can be used immediately.

C. Incremental backups are not allowed until a non-incremental backup is taken.

D. Incremental backup images for the original database can be used to restore the new

database.

Answer: A,C

Explanation:


QUESTION NO:19

Due to an application error, some data was deleted from a very large table residing in table

space

TS1. The table space was then renamed TS2 before the error was detected. Rather than

try and rebuild this table, it was decided that database DB1 would be restored and then

rolled forward to a point-in-time (PIT) before the delete operation took place. Unfortunately

the PiT roll forward was done to a time that was too early and some critical transactions

were missing when the database was brought back on-line. Which steps must be taken to

ensure that the critical transactions which are currently missing from the database are

11

correctly applied to the database and that table space TS1 is renamed TS2?

A. 1. Restore database DB1.

2. Roll forward to the correct point-in-time.

3. Rename TS1 to TS2.

B. 1. Restore table space TS1 from the DB1 backup image.

2. Roll forward to the correct point-in-time.

3. Rename table space TS1 to TS2.

4. Re-run the batch processes.

C. 1, Restore database DB1

2. Roll forward to end of logs.

D. 1. Restore table space TS1 from the DB1 backup image.

2. Roll forward to end of logs.

Answer: A

Explanation:


QUESTION NO:12

Because of an application abend, a database named

PAYROLL needs to be restored to approximately 9:26 am on June 1, 2009. After the

database is restored from a backup image, the command shown below is executed:

ROLLFORWARD DATABASE payroll TO 2009-06-01-09.26.44.609002

USING LOCAL TIME AND STOP

When this command is executed, the error shown below is generated:

7

SQL4970N Roll-forward recovery on database “PAYROLL” cannot reach the specified stop

point (end-of-log or point-in-time) because of missing log file(s) on node(s) “0”.

Which two commands could be used to resolve this error? (Choose two.)

A. ROLLFORWARD DATABASE payroll TO END OF LOGS AND STOP

B. ROLLFORWARD DATABASE payroll TO 2009-06-01-09.26.44.609002 USING UTC

TIME AND STOP

C. ROLLFORWARD DATABASE payroll TO 2009-06-01-09.26.44.609002 USING LOCAL

TIME

AND STOP OVERFLOW LOG PATH /mnt/arclog

D. ROLLFORWARD DATABASE payroll TO 2009-06-01-09.26.44.609002 USING UTC

TIME

AND STOP NORETRIEVE MISSING RECORDS

Answer: A,C

Explanation:


QUESTION NO:23

13

How do you turn on Self-Tuning Memory Manager (STMM)?

A. UPDATE DB CFG FOR USING SELF_TUNING_MEM ON

B. db2set SELF_TUNING_MEM=ON

C. UPDATE DB CFG FOR USING AUTOMATIC_MEMORY ON

D. db2set AUTOMATIC MEMORY=ON

Answer: A

Explanation:


QUESTION NO:2

Click the Exhibit button

Given the INSERT statements shown below:

INSERT INTO applicant VALUES (1 ,’M’ 54);

INSERT INTO applicant VALUES (2, ‘F’, 38);

INSERT INTO applicant VALUES (3, ‘M’, 21);

INSERT INTO applicant VALUES (4, ‘F’, 91);

INSERT INTO applicant VALUES (5, ‘C’, 50);

INSERT INTO applicant VALUES (6, ‘C’, 70);

2

INSERT INTO applicant VALUES (7, ‘C’, 95);

How many rows will be successfully inserted?

A. 1

B. 3

C. 5

D. 7

Answer: C

Explanation:


QUESTION NO:11

BOB and ALICE moved from the DEVELOPER group to the ANALYST group.

As the security administrator, which two commands would remove Bob and Alice from the

DEVELOPER group? (Choose two.)

A. REVOKE ROLE developer FROM bob, alice

B. REVOKE GROUP developer FROM bob, alice

C. REVOKE ROLE developer FROM USER bob, USER alice

D. REVOKE GROUP developer FROM USER bob, USER alice

Answer: A,C

Explanation:


CertBus exam braindumps are pass guaranteed. We guarantee your pass for the A2090-541 exam successfully with our IBM materials. CertBus Assessment: DB2 9.7 DBA for LUW-Assessment exam PDF and VCE are the latest and most accurate. We have the best IBM in our team to make sure CertBus Assessment: DB2 9.7 DBA for LUW-Assessment exam questions and answers are the most valid. CertBus exam Assessment: DB2 9.7 DBA for LUW-Assessment exam dumps will help you to be the IBM specialist, clear your A2090-541 exam and get the final success.

A2090-541 Latest questions and answers on Google Drive(100% Free Download): https://drive.google.com/file/d/0B_3QX8HGRR1mbnUtTmJjOHZKc0U/view?usp=sharing

A2090-541 IBM exam dumps (100% Pass Guaranteed) from CertBus: http://www.certgod.com/A2090-541.html [100% Exam Pass Guaranteed]

Why select/choose CertBus?

Millions of interested professionals can touch the destination of success in exams by certgod.com. products which would be available, affordable, updated and of really best quality to overcome the difficulties of any course outlines. Questions and Answers material is updated in highly outclass manner on regular basis and material is released periodically and is available in testing centers with whom we are maintaining our relationship to get latest material.

BrandCertbusTestkingPass4sureActualtestsOthers
Price$45.99$124.99$125.99$189$69.99-99.99
Up-to-Date Dumps
Free 365 Days Update
Real Questions
Printable PDF
Test Engine
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back
Secure Payment
Privacy Protection