Do not worry about your 70-463 exam preparation? Hand over your problems to CertBus in change of the 70-463 Implementing a Data Warehouse with Microsoft SQL Server 2012 certifications! CertBus provides the latest Microsoft 70-463 exam preparation materials with PDF and VCEs. We CertBus guarantees you passing 70-463 exam for sure.
We CertBus has our own expert team. They selected and published the latest 70-463 preparation materials from Microsoft Official Exam-Center: http://www.certbus.com/70-463.html
QUESTION NO:30
A customer has an IBM System Storage DS8700 and wants to reach the highest possible throughput in the
back-end for a storage-pool-striped volume out of an extent pool with 8 ranks. Over how many device
adapter pairs should a technical specialist spread the workload?
A. 2
B. 4
C. 6
D. 8
Correct Answer: D
QUESTION NO:122
A developer has prepared a Worklight mobile application for deployment to a production Worklight Server
environment and generated the .war, .wlapp and .adapter files for it. How should the developer deploy the
application files to the production Worklight Server environment?
A. Use the Worklight console to deploy the .war, .wlapp and .adapter files.
B. Use the production application server’s deployment tools to deploy the .war, .wlapp and .adapter files.
C.
Use the production application server’s deployment tools to deploy the .war file, and the Worklight
console to deploy the .wlapp and.adapter files.
D. Use the production application server’s deployment tools to deploy the .war and .adapter files, and the
Worklight console to deploy the.wlapp file.
Correct Answer: C
QUESTION NO: 16
A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4socket
blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants
redundancy and is going to install the following configuration:
Two Brocade 20Port
SAN Switch Modules
Two Nortel Networks 1/10 GB Uplink ESM
A redundant AMM
What is the minimum number of power supplies needed for this configuration to have full
redundancy?
A. 4
B. 3
C. 2
D. 8
Answer: A
QUESTION NO:81
The storage specialist needs to prepare an IBM System Storage DS8800 proposal including 64 host ports.
The offer needs to meet the lowest possible price. What is the minimum number of I/O Enclosure Pairs
PCI-E for this configuration?
A. one I/O enclosure pair PCI-E
B. two I/O enclosure pairs PCI-E
C. four I/O-enclosure pairs PCI-E
D. eight I/O-enclosure pairs PCI-E
Correct Answer: B
QUESTION NO: 1
An administrator is attempting to configure a new deployment of 56 POWER7 Blades across 4 IBM
BladeCenter H chassis. Each blade will be installed with an IVM and 2 LPARs.IVM is installed and the
administrator checks that both LHEA ports are reporting a Link State of “Up.” 2 LPARs are created and the
network traffic balanced by allocating one LHEA port to the first LPAR, the second port to the other. After
successfully installing the first LPAR via NIM, the administrator finds the second LPAR fails to netboot.
What should the administrator verify on the BladeCenter Chassis?
A. That 4 power supplies (PSU) have been installed.
B. That both the external LHEA ports have been cabled.
C. That a secondary I/O module has been installed and cabled.
D. That the Multi-Core Scaling (MCS) attribute is correctly set on both LHEA ports.
Correct Answer: C