All4Certs Exam Archive,Microsoft Archive Free Providing CertBus VMware VCP511 VCE Exam Study Guides With New Update Exam Questions

Free Providing CertBus VMware VCP511 VCE Exam Study Guides With New Update Exam Questions

As a leading IT exam study material provider, CertBus not only provides you the VCP511 exam questions and answers but also the most comprehensive knowledge of the whole VCP511 VMware Certified Professional on VSphere 5 certifications. We provide our users with the most accurate VCP511 VMware Certified Professional on VSphere 5 study material about the VCP511 exam and the guarantee of pass. We assist you to get well prepared for VCP511 certification which is regarded valuable the IT sector.

We CertBus has our own expert team. They selected and published the latest VCP511 preparation materials from VMware Official Exam-Center: http://www.certgod.com/VCP511.html

QUESTION NO:3

A customer asks for the thermal load (BTU/hr) to determine whether their existing cooling system will

support the IBM System Storage DS8000. Where can the sales representative find this information?

A. IBM System Storage DS8000: Introduction and Planning Guide

B. IBM DS8000 Interoperability Matrix on the support page on the web

C. IBM System Storage DS8000: User’s Guide

D. IBM System Storage DS8000: Solution Assurance Guide

Correct Answer: A

QUESTION NO: 61

The administrator of a Power 740 is attempting to define an IVE port as promiscuous for a new VIO server.

All LPARs using the IVE port have been shut down, but the administrator still receives a message stating

that the VIO server cannot be designated as the promiscuous LPAR. What steps can be performed to

enable the IVE port as promiscuous for the VIO server?

A. Power off the Managed System and reactivate it.

B. Remove the IVE configuration from the existing LPARs and reactivate them.

C. Set the promiscuous setting to “none” and save the setting before attempting the operation again.

D. Change the MCS value from 16 to a lower value.

Correct Answer: B

QUESTION NO: 155

An administrator has dynamically allocated a new virtual FC adapter to an AIX client. When running cfgrngr

on the client, the administrator receives the following error:

Method error (/usr/lib/methods/cfg_vfc -I fcs0):

0514-040 Error initializing a device into the kernel

Which of the following could explain the error?

A. The client adapter has been configured to use a 32bit kernel.

B. The fileset devices.vdevice.vfc-client.rte needs to be installed.

C. The physical fibre channel adapter on the VIO server does not support NPIV.

D. The client adapter has been configured to use an invalid virtual server adapter

Correct Answer: D

QUESTION NO: : 131

What are three available formats for an audit report generated by the Tivoli Common

Reporting tool? (Choose three.)

A. TXT

B. CSV

C. HTML

D. ODBC

E. PostScript

F. Microsoft Excel

Answer: C,E,F

Explanation:

QUESTION NO: 47

A customer has two Ethernet Switch Modules installed in an IBM BladeCenter Enterprise chassis.

The modules were configured identically. The Ethernet module in bay one was inadvertenly reset

to factory defaults. Which solution returns the module to the customerspecific configuration?

A. Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1

using the switch CLI or Web interface

B. Swap the modules, which will automaticallyresynch the settings stored in the Advanced

Management Module

C. Back up the configuration of the Ethernet module in bay one and restore it to the Ethernet

module in bay two using the AMM

D. Restore the configuration from NVRAM using the Switch Module Web interface

Answer: A