All4Certs Exam Archive [Latest Version] Easily Pass 9A0-327 Exam With CertBus Updated Adobe 9A0-327 Preparation Materials

[Latest Version] Easily Pass 9A0-327 Exam With CertBus Updated Adobe 9A0-327 Preparation Materials

Categories :

CertBus provides the most up to date and accurate preparing materials of the 9A0-327 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your 9A0-327 Adobe CQ 5.5 Component Developer ACE Exam exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a Adobe certified professional in IT industry.

We CertBus has our own expert team. They selected and published the latest 9A0-327 preparation materials from Adobe Official Exam-Center: http://www.certgod.com/9A0-327.html

QUESTION NO:14

A BPM application developer has been asked to estimate the number of user story points needed

to implement an activity within IBM Business Process Manager V8.0 based upon the following

user story: As a Call Center Supervisor, I need to review the Call Center Representative’s notes

for any call that lasts longer than 15 minutes. Assuming this is the only user story that pertains to

this activity, how must the BPM application developer proceed?

A. Find out which system stores the call notes before providing an estimate.

B. Build a prototype of the activity, so that an accurate estimate can be provided.

C. Provide a user story estimate that is greater than 2, because there are two roles involved

D. Ask a user story owner to revise the user story, so that it includes the business value

statement.

Answer: D

QUESTION NO:18

A solution implementer needs to integrate a DataPower appliance with an IMS COBOL

application. The multi-protocol gateway is created with an HTTP Front Side Handler and an IMS

Connect backside URL of the form dpims://. The EBCDIC Header Conversion is configured as

“on” in the IMS Connect object. What benefit(s) can the solution implementer achieve by using this

Header Conversion option?

A. Converts IMS headers to ASCII encoding

B. Converts IMS headers to EBCDIC encoding

C. Converts both IMS headers and payload to ASCII encoding

D. Converts both IMS headers and payload to EBCDIC encoding

Answer: B

Explanation:

QUESTION NO:141

An administrator needs to establish a long-term system performance monitoring process. The administrator needs to show long-term trends in CPU and disk capacity use, with the limits for the processor model on charts.

Which tool should the administrator use to support this requirement?

A. IBM i Performance Explorer (PEX)

B. IBM System Director Navigator for i

C. System i Navigator Management Central

D. IBM Performance Management for Power Systems

Correct Answer: D

QUESTION NO:25

A BPM application developer is asked by a system administrator to fix an issue with a failed

process instance in a on-line runtime environment. The system administrator has determined that

the problem is with a variable called tw.local.carSelection. The value of tw.local.carSelection is

incorrect and needs to be set to “Truck”. Assuming the BPM application developer has been

granted all security privileges required, which of the following approaches are valid to fix the

problem? (Choose two)

A. Using the Inspector tab via the Process Designer:

1. Select the failed process

2. Use the execution evaluator to change the data

3. Select the ‘Resume’ button

B. Using the Inspector tab via the Process Designer:

1. Select the failed process

2. Select the variables tab

3. Edit the data

4. Select the ‘Resume’ button

C. Using the Designer tab via the Process Designer:

1. Open the process

2. Change the data

3. Deploy a new snapshot

4. Select “Migrate Existing Instances”

D. Using a database client connected to the BPM Process DB:

1. Open the LSW_BPD_INSTANCE_DATA table

2. Identify the failed process ID

3. Execute SQL to update the data

E. Using the Process Inspector tab via the Process Admin Console:

1. Select the failed process

2. Select the failed task

3. Open the data tree

4. Edit the data

5. Select ‘Retry Failed Steps’

Answer: A,E

QUESTION NO:121

A company discovers a bug in one of the HTML pages of a Worklight hybrid mobile application that it has

recently published to the Android Google Play store. It has fixed the bug and re-deployed the application to

the production Worklight Server without changing its version number. Which additional administrative step,

if any, must be performed for the update to take effect the next time a user accesses the application on a

device?

A. No additional administrative steps are required.

B. Re-publish the application to the Android Google Play store.

C. Change the application status to Updated in the Worklight Console.

D. Change the application status to Updated in the Worklight Console and re-publish the application to the

Android Google Play store.

Correct Answer: A