Do not worry about your C8010-471 exam preparation? Hand over your problems to CertBus in change of the C8010-471 IBM Marketing Operations V8.6, Deployment certifications! CertBus provides the latest IBM C8010-471 exam preparation materials with PDF and VCEs. We CertBus guarantees you passing C8010-471 exam for sure.
We CertBus has our own expert team. They selected and published the latest C8010-471 preparation materials from IBM Official Exam-Center: http://www.certgod.com/c8010-471.html
QUESTION NO:14
A customer is upgrading an HMC to a new release using Recovery DVD5 for the new release level. Which action must be completed before performing the upgrade from DVD process?
A. Run the `HMC Management> Back Up HMC Data’ to DVD.
B. Run the `HMC Management> Save Upgrade Data’ to HMC disk.
C. Run the `HMC Management> Back Up HMC Data’ to NFS server.
D. Run the `HMC Management> Save Upgrade Data’ to the administrator’s PC.
Correct Answer: B
QUESTION NO: 118
A production application is hosted across two Power 750 Express servers, managed by an HMC. Each
machine has 16 cores and 32GB RAM. Four 8GB LPARs are defined across the two systems and only 3
LPARs are active at once. Live Partition Mobility is used to maintain availability when maintenance is
required.
A test environment is being built across two Power 550 Express servers. Each machine has 8 cores and
16GB RAM. Four 4GB LPARs will be defined across the two systems, again only 3 will be active at once.
To isolate the test and production environment, the test environment is managed by two IVMs.
Two LPARs have been created on each test server. The administrator initiates a Live Partition Mobility
operation to test moving LPARs between the servers.
The migrlpar command fails to migrate the 4th LPAR with the following error:
“The target managed system does not have enough available memory to create the partition.”
Because the 4th LPAR was inactive, it was expected that an inactive migration would be successful.
Why would this inactive migration fail on the test environment, but succeed on the production
environment?
A. IVM-managed systems do not support inactive migrations.
B. IVM-managed systems reserve RAM allocations, even for inactive LPARs.
C. The target managed system already has the maximum number of partitions.
D. Active Memory Sharing (AMS) or Active Memory Expansion (AME) is required for RAM over
commitment.
Correct Answer: B
QUESTION NO:53
A just announced two-port Ethernet card has been installed on a system and it is not recognized.
On the HMC the slot shows empty. The device driver has been installed and cfgmgr runs
normally. What is the most appropriate action to solve this problem?
A. Update the HMC software
B. Update the system firmware
C. Re-install the device driver
D. Flash update the two-port card
Answer: B
QUESTION NO: 8
Using the Exception Console of the IBM Sterling Selling and Fulfillment Suite, the exceptions
raised by asynchronous services can be viewed. The developer needs the ability to view the error
XML, modify it, and process it. Which property of the Receiver Link Exception Handling properties
should the developer turn on?
A. Is Reprocessible
B. Handle Exceptions
C. Process Exceptions
D. Reprocess Exceptions
Answer: A
Explanation:
QUESTION NO:29
A customer has requested an IBM System Storage DS8700 solution to meet the following requirements:
-20% yearly growth
-29,000 IOPS
-approximately 50/50 mix of read/write operations
-small (4 KB) data transfers The storage specialist has created a Disk Magic model in which each port is
capable of approximately 2,900 to 3,100 IOPS. What is the minimum number of ports that should be
configured on the DS8700 to handle the projected workload for the first year?
A. 8
B. 10
C. 12
D. 16
Correct Answer: C