Don’t worry about how to get yourself well prepared your 920-457 exam! CertBus will work you out of your 920-457 exam with the latest updated 920-457 CallPilot Ris.4.0 Unified Messaging Exam PDF and VCE dumps. CertBus provides the latest real Nortel 920-457 exam preparation material, covering every aspect of 920-457 exam curriculum.
We CertBus has our own expert team. They selected and published the latest 920-457 preparation materials from Nortel Official Exam-Center: http://www.certbus.com/920-457.html
QUESTION NO:130
A custom application program is submitted daily by operations personnel using the CALL command. The program has a requirement that the prior days backup tape volume serial be passed via a parameter so the program can read the tape. The program has failed due to syntax errors when entering the CALL command and parameters.
What can the administrator do to help minimize similar errors?
A. Use the Check Tape command and set the Exit parameter to call the program.
B. Create a Job Schedule Entry to call the program and prompt for the parameter.
C. Use the command SBMJOB to call the program and set the OTAPE data area parameter to *LAST.
D. Develop a CL program to capture the correct parameter value. call the program, and pass the parameter.
Correct Answer: D
QUESTION NO:118
A client has bought an IBM System Storage DS8000 and needs to attach a Sun Solaris Host with 2 HBAs
via one fabric to 4 I/O ports on the DS8000. The client needs redundant paths to the volumes on the
DS8000. What is the maximum number of volumes that can be used on the Solaris host?
A. 256
B. 512
C. 1024
D. 2048
Correct Answer: C
QUESTION NO:140
An HTTP adapter is deployed on a Worklight server. Which steps need to be taken by the developer to
receive data from the adapter in an application?
A. Create an invocationData object that contains the adapter and procedure names and send it through
the WL.Server.invokeProcedureAPI with the onSuccess and onFailure callbacks.
B. Create an invocationData object that contains the adapter and procedure names and send it through
ExamReal.com — 100% Real QandAs | 100% Real Pass
the WL.Client.invokeProcedureAPI with the onSuccess and onTimeout callbacks.
C. Create an invocationData object that contains the adapter and procedure names and send it through
the WL.Client.invokeProcedureAPI with the onSuccess and onFailure callbacks.
D. Create an invocationData object that contains the backend URL and procedure name and send it
through theWL.Client.invokeProcedure API with the onSuccess and onTimeout callbacks.
Correct Answer: C
QUESTION NO: 89
A customer is consolidating two POWER6 595 servers to a single Power 795. The two 595 servers each
have 24 active processors and have the following LPARs using dedicated processors, running
continuously:
The new Power 795 system will have two Processor Books (nodes), each with 8 cores activated in all
MCMs (Multi Chip Modules).
LPAR1 is in need of more processing power. If all the other LPARs keep their existing Processor
allocation, what is the maximum number of processors which can be allocated to LPAR1?
A. 27
B. 32
C. 36
D. 100
Correct Answer: B
QUESTION NO:58
Which of the following statements is TRUE about the DOM API?
A. It defines memory management strategies.
B. It defines a standard way to create