Do not worry about that if you are stuck in the PD0-001 exam difficulties, CertBus will assist you all your way through the PD0-001 CompTIA PDI Beta Exam exam with the most update PD0-001 PDF and VCE dumps. CertBus exam PD0-001 preparation materials are the most comprehensive material, covering every key knowledge of PD0-001 CompTIA PDI Beta Exam exam.

We CertBus has our own expert team. They selected and published the latest PD0-001 preparation materials from CompTIA Official Exam-Center: http://www.certgod.com/PD0-001.html

QUESTION NO: 114

An administrator is attempting to remove a virtual adapter from an AIX partition using an HMC running

V7R7.2. The DLPAR operation is failing with the following message:

“Virtual adapters that are marked as required cannot be dynamically removed from the partition. Please

change your adapter selections and try the operation again.”

How can the administrator remove the virtual adapter while minimizing any downtime?

A. Remove the virtual adapter from the partition profile and reactivate the partition.

B. Modify the active properties for the partition so that the adapter is not required for partition activation

and repeat the DLPAR operation.

C. Modify the last activated partition profile so that the adapter is not required for partition activation and

repeat the DLPAR operation.

D. Select the ‘Force’ option when performing the DLPAR operation.

Correct Answer: C

QUESTION NO:20

An administrator has been asked to install the following PTF packages from DVD. SF99710 Cumulative PTF Package SF99627 Electronic Service Agent Group SF99707 Technology Refresh SF99708 Group Security SF99709 Group HIPER

Using Option 8 (Install Program Temporary Fix Package) on the GO PTF menu, how can the administrator install all of the above PTFs in the shortest possible time?

A. Install all packages as a multiple volume PTF set.

B. Install SF99710 Cumulative PTF Package as it contains all of the other PTFs.

C. Load and permanently apply the cumulative package followed by each of the group PTFs.

D. Install the Technology Refresh first, IPL, then install the remaining packages as a group.

Correct Answer: A

QUESTION NO:64

What is the meaning of the highest schedule priority (PTYLMT) parameter, when set to 0 on the CHGJOB JOBPTY(0) command?

A. A job is moved to the very top of the job queue

B. A system job is moved to the very top of the processor queue

C. A batch job is put in *HLD status while it is on a job queue

D. The job’s spooled files are moved to the very top of the output queue

Correct Answer: A

QUESTION NO:42

From the XPath specification, which of the following axes, when combined together, reference all

nodes in a document, except the namespace and attribute nodes?

A. Self axis

B. Following-sibling axis

C. Descendant axis

D. Preceding-sibling axis

E. Ancestor axis

F. Preceding axis

G. Following axis

Answer: A, C, E, F, G

QUESTION NO:93

What is one reason the customer should install IBM DS8000 Virtual Private Network (VPN) technology for

the Call Home function?

A. to avoid using a more expensive dial-up modem

B. to load new licensed internal code

C. to achieve more efficient and faster problem resolution

D. to enable capacity on demand

Correct Answer: C