CertBus ensures to provide the most update 70-293 Planning and Maintaining a Microsoft Windows Server 2003 Network Infrastructure exam questions with the most accurate answers. CertBus 70-293 are the most complete and authoritative exam preparation materials with which one can pass the 70-293 exam in an easy way. Preparing for Microsoft 70-293 Planning and Maintaining a Microsoft Windows Server 2003 Network Infrastructure exam is really a tough task to accomplish. But CertBus will simplified the process.

We CertBus has our own expert team. They selected and published the latest 70-293 preparation materials from Microsoft Official Exam-Center: http://www.certgod.com/70-293.html

QUESTION NO: 50

Which of the following steps does a customer use to upgrade the firmware on the AMM to the

latest level?

A. Open a Web browser and log on to the AMM?in the navigation frame, click MM Firmware

Update under MM

B. Control?click Browse? select the .exe file? click the Upgrade/Update button

C. TFTP to the AMM?from the Main Menu, select Update? browse to the downloaded .exe file

D. Open a Web browser and log on to the AMM?in the navigation frame, click MM Firmware

Update under MM Control? click Browse? select the .pkt file? click the Upgrade/Update button

Answer: D

QUESTION NO:85

A customer has the following non-virtualized servers:

-three Exchange servers, each with 2.8 TB database

-five System i Domino servers, each with 2 TB database

-20 TB usable capacitySun/SAP cluster

-70 TB usable capacity of System p requirement

-annual growth rate of 12 TB usable capacity per year What is the most cost-effective solution for three

years?

ExamReal.com — 100% Real QandAs | 100% Real Pass

A. IBM System Storage DS5020 with 300 GB drives

B. IBM System Storage DS5300 with 300 GB drives

C. IBM System Storage DS8700 with 300 GB drives

D. IBM System Storage DS5020 with 1 TB SATA drives

Correct Answer: C

QUESTION NO:79

A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery

site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor

is a primary consideration when proposing a solution for this customer?

A. compatibility of copy functions

B. difference in capacities in the two systems

C. cache size discrepancies between the two systems

D. the necessity of using two storage management products

Correct Answer: A

QUESTION NO:70

An administrator has been provided with a POWERS system for a disaster recovery test. The Licensed

Internal Code has been loaded and the disks initialized.

The recovery of IBM i 7.1, which had originally been saved on a Power 720, failed.

Which action will resolve the problem?

A. Use a D-Mode IPL to install the operating system.

B. Restart the recovery specifying the Target Release parameter as 7.1.

C. Install the operating system with the *PREV option and specify POWERS as the system to restore to.

D. Slip-install the LIC from the source system backup, and then continue with the remainder of the install.

Correct Answer: D

QUESTION NO:14

A customer is upgrading an HMC to a new release using Recovery DVD5 for the new release level. Which action must be completed before performing the upgrade from DVD process?

A. Run the `HMC Management> Back Up HMC Data’ to DVD.

B. Run the `HMC Management> Save Upgrade Data’ to HMC disk.

C. Run the `HMC Management> Back Up HMC Data’ to NFS server.

D. Run the `HMC Management> Save Upgrade Data’ to the administrator’s PC.

Correct Answer: B