All4Certs Exam Archive Free Download the Most Update CertBus EMC E22-192 Brain Dumps

Free Download the Most Update CertBus EMC E22-192 Brain Dumps

Categories :

CertBus provides the most up to date and accurate preparing materials of the E22-192 certification exam questions and answers , testing software, exam PDF and VCE files to help you prepare your E22-192 Captiva Installation, Configuration, and Management Exam exam. What training you are looking for? Come to visit our site and choose CertBus online certification materials, you will get a quick and cost-efficient way to become a EMC certified professional in IT industry.

We CertBus has our own expert team. They selected and published the latest E22-192 preparation materials from EMC Official Exam-Center: http://www.certgod.com/E22-192.html

QUESTION NO: 68

A rule is configured such that ITEM1 cannot be scheduled until ITEM2 has completed the

schedule transaction. However, another rule prevents ITEM2 from scheduling until ITEM1 has

been scheduled. This type of dependency is detected by the transaction dependency logic and an

exception is thrown along with a list of the dependencies that caused this. Which type of

dependency defines this scenario?

A. Cross dependencies

B. Circular dependencies

C. Transactional dependencies

D. Inter-transaction dependencies

Answer: B

Explanation:

QUESTION NO:12

Which statement describes server firmware delivery that uses PTF5 on a POWER7 system?

A. A single IBM i (57703S1) PTF is ordered to update server firmware.

B. The firmware is ordered using the marker PTF ID, such as MHxxxxx, and is installed with normal IBM i PTE commands.

C. The server firmware PTE (MFxxxxx) is ordered from the connected HMC and is sent to the service partition for install.

D. The HIPER PTF group is ordered for the Licensed Internal Code (5770999) and the order is flagged with Include Firmware Update *YES.

Correct Answer: A

QUESTION NO: 144

In a large SAP production system, the database should be protected with highest availability and

performance. How can this requirement be met?

A. Enable LAN-free backup and set up a storage agent.

B. Schedule each database to be backed up at different times.

C. Use IBM Tivoli Storage Manager for ERP and customize multiple sessions.

D. Use the IBM Tivoli Storage Manager Backup-Archive Client with different option files.

Answer: C

QUESTION NO:20

An administrator has been asked to install the following PTF packages from DVD. SF99710 Cumulative PTF Package SF99627 Electronic Service Agent Group SF99707 Technology Refresh SF99708 Group Security SF99709 Group HIPER

Using Option 8 (Install Program Temporary Fix Package) on the GO PTF menu, how can the administrator install all of the above PTFs in the shortest possible time?

A. Install all packages as a multiple volume PTF set.

B. Install SF99710 Cumulative PTF Package as it contains all of the other PTFs.

C. Load and permanently apply the cumulative package followed by each of the group PTFs.

D. Install the Technology Refresh first, IPL, then install the remaining packages as a group.

Correct Answer: A

QUESTION NO: 15

An administrator is preparing to upgrade the environment’s dual Virtual I/O servers (VIOS) from V1.2 to

V2.1

What must considered in preparation for this upgrade?

A. All client LPARs must be shutdown as both VIO servers have to be upgraded to V2.1 at the same time.

B. The VIOS must be upgraded to the latest fixpack of V1.5 before upgrading to V2.1.

C. The only upgrade method that will be supported is using NIM because the current VIOS is lower than

V1.3.

D. VIOS V2.1 requires AIX clients to be running AIX V6.1 at a minimum.

Correct Answer: B