All4Certs Exam Archive Free Providing CertBus IBM 000-766 VCE Exam Study Guides With New Update Exam Questions

Free Providing CertBus IBM 000-766 VCE Exam Study Guides With New Update Exam Questions

Categories :

This dump is 100% valid to pass IBM 000-766 exam. The only tips is please do not just memorize the questions and answers, you need to get through understanding of it because the question changed a little in the real exam. Follow the instructions in the CertBus 000-766 Systems Management Technical Support V2 PDF and VCEs. All CertBus materials will help you pass your IBM exam successfully.

We CertBus has our own expert team. They selected and published the latest 000-766 preparation materials from IBM Official Exam-Center: http://www.certgod.com/000-766.html

QUESTION NO:20

The operations team has been testing a new message routing application in their IBM WebSphere MQ

V7.0 pre-production environment. When the application is started, many of the other applications designed

to interface with the message routing application begin to experience long wait times while retrieving

messages. The operations team notices that many of the queues that the message routing application

puts to, are filling up. The team also notices that the number of active queue manager log files has

increased. What is the most probable cause for the performance slowdown for getting applications?

A. The data store for the message routing application is full

B. The MQGET calls are not issued with the FASTPATH retrieval parameter for improved performance

C. The message routing application issues several MQPUT calls within syncpoint without committing them

D. The getting applications need to invoke the new fast retrieval algorithm in IBM WebSphere MQ V7.0 for

message retrieval

Correct Answer: C

Explanation

Explanation/Reference:

QUESTION NO: 34

What is a good step to verify the behavior of a schedule?

A. validate activity using events listing

B. view the input and output of the test while it is running

C. verify external schedules?interaction with the schedule

D. use Rational Quality Manager to run a report to look at the schedule data

Answer: A

QUESTION NO: 126

An administrator is troubleshooting a network connectivity error on a POWER blade. Checking netstat, the

administrator can see that the relevant adapter is “up and running”. A ping test to the default gateway

times out.

Checking on another adapter, connected to the same LPAR, ping works as expected.

What needs to be checked?

A. If the switch module port for the adapter is enabled and plugged in

B. If the mapping between network adapter and switch module port is correct

C. If the MCS value is correctly sized for the number of LHEAs

D. If the CIOv network adapter is installed in the correct slot

Correct Answer: C

QUESTION NO: 29

Why should you keep notes when recording a performance test?

A. to correlate recording activity with the recorded test

B. to document the recording

C. to create comments for the test

D. to record unusual application behavior

Answer: A

QUESTION NO:131

Which job log message heading identifies the score in the job log?

A. OSH script …

B. main_program: orchgeneral: loaded

C. main_program: Broadcasting score.

D. main_program: This step has 3 datasets: …

Answer: D

Explanation: